ROCK BOLT GROUT
HIGH STRENGTH FAST SETTING PUMPABLE GROUT
PRESERVING EXCAVATIONS FOR LONG-TERM MINING
ROCK BOLT GROUT
ROCK BOLT GROUT IS A HIGH-STRENGTH, FAST-SETTING GROUT SPECIFICALLY
FORMULATED FOR ANCHORING ROCK BOLTS IN UNDERGROUND MINING OPERATIONS,
PROVIDING OVER 10 TONS OF PULL OUT STRENGTH WITHIN 1 HOUR.
PROVIDING OVER 10 TONS OF PULL OUT STRENGTH WITHIN 1 HOUR.
This pumpable grout is engineered to deliver exceptional support and stability to excavations, ensuring long-term preservation of rock structures critical to mining safety and productivity.

We take secondary
support Seriously!
support Seriously!
When applied, Rock Bolt Grout flows easily into drilled holes to encapsulate rock bolts securely, forming a strong bond with the surrounding rock.
This bond is essential for maintaining the integrity of rock masses, especially in areas prone to shifting or collapse. The fast-setting nature of Rock Bolt Grout means that it hardens quickly, providing immediate reinforcement to rock bolts and minimizing the risk of movement. This rapid cure time is particularly advantageous in active mining sites where minimizing downtime is crucial for continuous operations.
Additionally, Rock Bolt Grout’s pumpable consistency allows it to be applied precisely and efficiently, even in hard-to-reach or confined underground areas. This feature ensures comprehensive support coverage, reinforcing weak zones and stabilizing the excavation site effectively. Designed to withstand the long-term pressures and stresses of underground environments, Rock Bolt Grout enhances the durability and resilience of rock bolt installations, contributing to safer and more sustainable excavation practices.
-
Huge cost savings against pumpable resin and resin capsules.
-
High early strengths.
-
Shelf life up to 8 months
-
Water Based
-
Non-toxic.
-
Non flammable.
-
Non heat sensitive
-
Easy Storage
Mixing Instructions
Add One 20kg Tunnelguard To 1 Bottle Of Polymer And Mix
Handling
Handle with care, wear gloves, and avoid contact with skin.
Spillage
Avoid Direct Entry Into Drains & Waterways, Reclaim Where Possible Or Absorb In Earth Or Sand.
First Aid If Swallowed
Drink plenty of water.
First Aid Eye Contact
Irrigate with copious amounts of water and seek medical assistance.
Storage
Keep dry. Avoid damp or wet areas & keep out of the sun.
Pot Life
20 minutes.
Area Covered
20kg Tunnelguard Bag And Polymer Bottle Equals 1m2at 8mm Thickness